Green Giraffe Advisory supported Green Create in the sale of a majority stake in its Wijster project to Vauban Infrastructure Partners. Green Create develops, builds, owns and operates integrated biological waste-to-value systems which process organic waste or wastewater streams to generate energy-rich biogas.
The Wijster plant, located in the Netherlands, is one of Europe’s largest biomethane production plants with a current biomethane installed capacity of 237 GWh/year to be injected in the Dutch grid. The plant is an anaerobic digestion plant designed to process primarily poultry manure, with ability to operate with diversified feedstock such as organic waste. The Wijster plant has been operating since 2022, and the project encompasses two planned extensions. Through these scheduled expansions, the Wijster plant will have a total capacity of circa 554 GWh.
Green Giraffe advised on the sale process including support in defining the adequate sale strategy, preparing the due diligence material, the information package and the financial model, and assistance in negotiations with investors.